1) Ensure USE BY DATE on Part A is current (not expired).

2) Ensure all components are between 59-77°F (15-25°C).

3) Shake Part A-1 (4hr. or 8hr.) and pour into Part A and stir.

4) While stirring, pour Part B into A/A-1 mixture. Scrape all sides and bottom well. Stir for 90 seconds.

5) Allow A/A-1/B mixture to dwell (sit) for one (1) minute.

6) Add 16 oz. of room-temperature water slowly while stirring for 30 seconds.

7) If Coating Tile & Grout: Add 1.5 oz. Standard EPIC Bond Promoter and stir for 30 seconds.

8) OPTIONAL – add Aggregate Additive or one (1) bag Ultra Grip. Stir before every pour.

EPIC Contractor Mixing Instructions

1) Ensure USE BY DATE on Part A is current (not expired).

2) Ensure all components are between 59-77°F (15-25°C).

3) Shake Part A-1 (4hr. or 8hr.) and pour into Part A and stir.

4) While stirring, pour Part B into A/A-1 mixture. Scrape all
sides and bottom well. Stir for 90 seconds.

5) Allow A/A-1/B mixture to dwell (sit) for one (1) minute.

6) Add 32 oz. of room-temperature water slowly while
stirring for 30 seconds.

7) If Coating Tile & Grout: Add 3 oz. Contractor EPIC Bond
Promoter and stir for 30 seconds.

8) OPTIONAL – add Aggregate Additive or two (2) bags
Ultra Grip. Stir before every pour.