Mixing Instructions for IMPACT®
IMPACT Standard Kit Mixing Instructions
1) Ensure USE BY DATE on Part A is current (not expired).
2) Ensure all components are between 59-77°F (15-25°C).
3) Shake Part A-1 (4hr. or 8hr.) and pour into Part A and stir.
4) While stirring, pour Part B into A/A-1 mixture. Scrape all
sides and bottom well. Stir for 90 seconds.
5) Allow A/A-1/B mixture to dwell (sit) for one (1) minute.
6) Add Part C slowly while stirring for 30 seconds.
7) OPTIONAL – add one (1) scoop Aggregate Additive or one (1) bag Ultra
Grip for added traction. Stir before every pour.
Contact your UDT representative if applying more than 1 coat.
IMPACT Contractor Kit Mixing Instructions
1) Ensure USE BY DATE on Part A is current (not expired).
2) Ensure all components are between 59-77°F (15-25°C).
3) Shake Part A-1 (4hr. or 8hr.) and pour into Part A and stir.
4) While stirring, pour Part B into A/A-1 mixture. Scrape all
sides and bottom well. Stir for 90 seconds.
5) Allow A/A-1/B mixture to dwell (sit) for one (1) minute.
6) Add Part C slowly while stirring for 30 seconds.
7) OPTIONAL – add two (2) scoops Aggregate Additive or two (2) bags Ultra
Grip for added traction. Stir before every pour.
Contact your UDT representative if applying more than 1 coat.
IMPACT Bulk Kit Mixing Instructions
1) Ensure USE BY DATE on Part A is current (not expired).
2) Ensure all components are between 59-77°F (15-25°C).
3) Shake Part A-1 (4hr. or 8hr.) and pour into Part A and stir.
4) Pour Part A/A-1 into a separate, clean 5-gallon pail.
5) While stirring, pour Part B into A/A-1 mixture. Scrape all
sides and bottom well. Stir for 90 seconds.
6) Allow A/A-1/B mixture to dwell (sit) for one (1) minute.
7) Slowly add 120 oz. Part C and stir for 30 seconds.
8) OPTIONAL – add seven (7) scoops of Aggregate Additive or seven (7) bags Ultra Grip for added traction. Stir before every pour.
Contact your UDT representative if applying more than 1 coat.