Mixing Instructions for IMPACT®

IMPACT Standard Kit Mixing Instructions

Ensure USE BY DATE on Part A is current (not expired).
Ensure all components are between 59-77°F (15-25°C).

1) Shake Part A-1 (4hr. or 8hr.) and pour into Part A and stir for 15 seconds.

2) Set a timer for 2 minutes and 30 seconds.

3) Pour Part B into Part A while stirring. (scraping sides and bottom).

4) After 2 minutes and 30 seconds slowly add Part C and stir for 2 minutes.

5) OPTIONAL – add 1 scoop Aggregate Additive or 1 bag Ultra Grip for traction. Stir before every pour.

Contact your UDT representative if applying more than 1 coat.

IMPACT Contractor Kit Mixing Instructions

Ensure USE BY DATE on Part A is current (not expired).
Ensure all components are between 59-77°F (15-25°C).

1) Shake Part A-1 (4hr. or 8hr.) and pour into Part A and stir for 15 seconds.

2) Set a timer for 2 minutes and 30 seconds.

3) Pour Part B into Part A while stirring. (scraping sides and bottom).

4) After 2 minutes and 30 seconds slowly add Part C and stir for 2 minutes.

5) OPTIONAL – add 2 scoops Aggregate Additive or 2 bags Ultra Grip for traction. Stir before every pour.

Contact your UDT representative if applying more than 1 coat.